now on to the steering rack and posts.
Install both steering posts. I do not use loctite on these since I take  the whole front clip off for maintenance. Since its off every week or so  and retightened it would be a pain to deal with loctite. It's up to you  on this one but I have never had one come loose in long mains so I  continue to do it this way.
 
Then the bearing go into the left side bellcrank and on to the saver assembly.
 
This very straight forward except for the loctite on the aluminum saver  tube. I prefer a big dab of red loctite and twist it around to spread it  on my finger. This ensures a good coverage in the threads and not too  much to get everywhere.
 
 
I chose to build mine with an aluminum upper saver peice but it will  require a little grinding to clear the new larger steering rack with the  big bearings. The stock plastic one shown here has a relief in the side  to clear the the rack
 
For proper saver tention (my preference) is to screw the assembly  together until the nut is flush with the tube and make a mark with a  black sharpie. I will then tighten it a full turn. ( to be a little  easier on your servo you can go with a half turn)
 
